Renovation of an existing traffic playground using StreetMark thermoplastic markings. The original graphics had been painted directly onto the asphalt surface and began peeling after only two years of use. The municipality therefore decided to remove the deteriorated paint and replace it with durable StreetMark markings while preserving the original layout, colors, and key graphic elements, including the educational snake motif with letters.
Prior to installation, the old paint was mechanically removed using a small milling machine, and the asphalt surface was thoroughly cleaned and prepared. The new thermoplastic markings were then heat-applied to ensure strong adhesion and long-term durability. The result is a complete transformation of an aging residential asphalt area into a visually attractive, functional, and long-lasting traffic playground for children.
Project benefits:
- High attractiveness for children and parents
- Encouragement of active movement, even among less motivated children
- A pleasant space for relaxation and outdoor learning
- Significant visual improvement
Technical parameters:
- Products: StreetMark play graphics
- Supplier & installation: Exclusively delivered by 4Soft
Installation:
- Area: 300 m²
- Target group: Children aged 3+
- Capacity: Approx. 15–30 children at the same time